Expert Reviewer of the Shatin to Central Link

The Shatin to Central Link is a landmark 17-kilometre railway project from north to south Hong Kong, connecting multiple districts and linking several existing railway and metro lines in a densely populated environment.
Hong Kong skyline at sunset

    Pypun Engineering Consultant Ltd.
    2019
    Hong Kong

    : Chief Project Manager & Team Lead, Immersed Tunnels

    : Sijbrand Sterkenburgh

    +45 51 61 46 01

    Sijbrand Sterkenburgh

Serving over 1 million daily commuters, this prestigious railway project not only improves public transport efficiency but also brings substantial social and economic benefits to one of the world’s most dynamic cities.

The centrepiece of this project includes the construction of a 1.7-kilometre immersed tunnel beneath Victoria Harbour. The tunnel is designed to carry two metro tracks and is located parallel to the existing cross-harbour tunnel.

Ramboll undertook a pivotal role as Independent Geotechnical Expert Advisor or the ‘Expert Reviewer’ for the immersed tunnel of the North South Line of Hong Kong. Ramboll contributed with the global immersed tunnel expertise that spanned the reference design, preliminary and detailed design of the permanent tunnel works, and comprehensive site audits.

Re­lated Pro­jects

View all
  • Fehmarnsund tunnel

    The Fehmarnsund Tunnel is a 1.7km long immersed tunnel connecting the German mainland to the island of Fehmarn. The new crossing will carry a dual two-lane highway and twin high-speed rail lines, increasing the capacity of the existing crossing in anticipation of the completion of the Fehmarnbelt Fixed Link that will connect Germany and Denmark.

    Fehmarnsund tunnel
  • Dreilindentunnel the first immersed tunnel in the Alps

    The Dreilindentunnel is a subproject under the main development programme of Lucerne Station that is one the largest railway stations in Switzerland which reached the limits of its capacity. The Swiss Railway authorities (SBB) is planning to expand the rail network with a new through going underground station to increase the capacity and shorter travel times.

    Dreilindentunnel the first immersed tunnel in the Alps

En­gage with us

View all
  • Sijbrand Sterkenburgh

    Sijbrand Sterkenburgh

    Chief Project Manager & Team Lead, Immersed Tunnels

    +45 51 61 46 01

  • Søren Wegener Gamst

    Søren Wegener Gamst

    Head of Department, Tunnels

    +45 51 61 45 69

  • Andrew Shaw

    Andrew Shaw

    Senior Specialist Manager

    +45 51 61 02 91