Australia’s first waste-to-energy plant

We're the Owner's Engineer for Australia’s first large-scale waste-to-energy facility in Kwinana. The facility will power up to 55,000 homes and has the potential to reduce CO2 emissions by more than 400,000 tonnes annually.

Australia produces more than 70 million tonnes of waste annually of which about 60% is recycled and the remaining 40% ends up in landfills. The new waste-to-energy facility in Kwinana south of Perth, Western Australia will divert waste from landfills, while generating power for the local community.

The facility will be the first large-scale facility of its kind in Australia. It will be capable of processing 400,000 tonnes of waste annually and producing 36MW of electricity, enough to power up to 55,000 homes.

The facility will recover resources and energy from municipal and commercial waste, equal to approximately 25% of Perth’s residual non-recyclable waste. It has the potential to cut CO2 emissions by more than 400,000 tonnes each year by significantly reducing the amount of waste taken to landfills, a major source of methane emissions, and by replacing energy from fossil fuels.

Avertas Energy, a co-development between financial groups Macquarie Capital and DIF, appointed Ramboll as technical advisor and Owner’s Engineer, responsible for the process technology and elements of the environmental permitting process.

In the planning phase, our team assisted the client in negotiating the engineering, procurement and construction (EPC) contract for the facility. As the Owner’s Engineer we are responsible for undertaking design review and inspection during manufacturing and construction. Moreover, we will oversee the testing and commissioning of the facility and transfer to commercial operations.

Ramboll has also been appointed as the project’s environmental advisor. Our environmental services include assessing potential re-use and disposal options for residue products generated as part of the project and assessing air quality both in the conceptual phase and for regulatory approvals.

Strict environmental standards

The plant will use well-proven grate technology, which uses thermally treated waste to heat water into steam to produce electricity and enables the recovery of valuable metals. The technology meets strict environmental standards and is already in use in many countries with a strong track record in Europe.

The facility also uses a highly advanced flue gas cleaning system, which protects against pollutants being released into the atmosphere. The emissions are continuously tracked through an emissions monitoring system that reports emissions online, which ensures emissions and local air quality remain within limits set by the Western Australian Government.

The facility is currently being constructed on site in Kwinana and is expected to reach commercial operation by 2023.

An estimated 0.8–1.0 tonne of CO2 is saved for each tonne of waste diverted from landfill. At the waste-to-energy facility in Kwinana, this leads to a CO2 reduction of 400,000 tonnes each year.

Approximately 93% of Australia’s energy supply (in 2019) came from fossil fuels. With a transition to waste-to-energy, the potential for decreasing CO2 emissions from energy production is abundant.

“This facility represents a significant opportunity to reduce pressure on landfill capacity and create a new and reliable source of green power. We are proud to be supporting Western Australia to achieve its waste management and green energy goals, and we are committed to engaging with local communities throughout construction and once the facility is operating"

Frank Smith
Avertas Energy

Related Projects

Se flere
  • Amager Bakke: leader in waste-to-energy

    A 10-year partnership between Ramboll and Copenhagen-based utility pushes the envelope for carbon capture, circular economy, and energy from waste, at the world's most efficient waste-to-energy plant.

    view of Amager Bakke waste-to-energy plant with harbour and boats in the foreground

  • Dubai's USD 1bn waste-to-energy facility

     The facility  is the first of its size and capacity in the Middle East and will set a benchmark in the region where around 150 million tonnes of waste is produced annually.

  • Carbon capture for net-zero Copenhagen

    Full-scale carbon capture plant at Copenhagen waste-to-energy facility, Amager Bakke, that will capture 500,000 tonnes of CO2 annually by end 2025, helping the Danish capital become carbon neutral.

    Amager Bakke photo shoot