Projects

Over the years, we have solved many distinctive and challenging projects for our customers. Ramboll’s Project excellence programme is dedicated to providing clients with world class project management competencies and the very best results.


Svanemollen Barracks

Precision scanning of a large heritage site enabled an accurate reconstruction of historical buildings.

3D laser surveys for Maersk Oil modification projects

In 2007 Ramboll Oil & Gas' survey department performed twentyfive 3D laser surveys for Maersk Oil on the company's modification projects.

Crane replacement project offshore Saudi Arabia

Ramboll assisted Saudi Aramco with the replacement of 17 tower cranes located at offshore installations in the Marjan and Zuluf fields.

Dan Bravo Field

3D scanning of four platforms increasing safety and getting instant access to field information.

Risk analysis at Nybro gas treatment plant

Ramboll Oil & Gas has provided a number of services for the Nybro gas treatment plant in Denmark, where natural gas from the South Arne and Tyra fields is purified and dried, and sulphur is removed, when necessary. In 2005 Ramboll conducted a major risk analysis assessment for the Nybro gas treatment plant.

Upgrade of LNG berth at Ras Laffan in Qatar

Ras Laffan is the centre of LNG and GTL activities in Qatar and the port is considered one of the largest LNG export facilities in the world. Ramboll Oil & Gas undertook the detailed engineering for an upgrade of the LNG berth at Ras Laffan during 2009 and 2010.

Extension of underground gas storage facility, EIA, at Lille Torup

Energinet.dk planned an extension of their gas storage facility in Lille Torup. The facility comprises an underground gas storage in a salt cavern an a processing plant. Ramboll provided a number of environmental assessment services for the project.

Fire and gas detection system for the Tyra platform complexes

For all modification projects reducing shutdown time to an absolute minimum without compromising safety is vital.

Smokeless flare, Fahahil Stripping Plant

Ramboll was given the task of remodelling and enlarging an existing old flare system at the Dukhan oil field on the west coast of Qatar.  In addition, we were to find a method for reclaiming some of the gas that would otherwise be burnt in the tower. At last, we were to implement improved combustion technology to obtain what is known as a “smokeless flare”- which means a flame without smoke.

Concept study for new flare project at Statoil Refinery Kalundborg

The StatoilHydro Refinery in Kalundborg is flaring directly to the atmosphere from a certain amount of PSV’s. The purpose with the project is to collect all discharge facilities to a new common flare system, Flare-3.

Cathodic protection of more than 600 wells

In 2010 Qatar Petroleum initiated a major life time extension programme in the Dukhan field 95 km west of the capital Doha in Qatar. Ramboll was awarded the Front End Engineering Design (FEED) study for the cathodic protection and off plot power supply for more than 600 oil, gas, and water wells.

Tyra East Rationalisation Project

The Tyra Field is the largest gas field in the Danish North Sea sector – it is operated by Maersk Oil, and has been producing since 1984. Ramboll has been part of the Tyra East Rationalisation Project; just one phase in a series of Optimisation Projects in the field.

Rectification of GRE piping systems at Al Shaheen

Maersk Oil Qatar operates the Al Shaheen field located 180 kilometres off the North East coast of Qatar in the Arabian Gulf. First oil was produced in 1994, and since then the field has undergone tremendous development with modification works and new designs still taking place on a continuous basis.

South Arne Phase III - Tie-in of two additional wellhead platforms

In 2010, Hess decided to expand their activities on the South Arne field with two additional wellhead platforms as part of the Phase III Development. Hess, Semco Maritime and Ramboll formed an EPC alliance to carry out brownfield work related to the project.

Sustainable development at Statoil Refinery

Since 1995 Statoil has executed large scale extension and modification environmental-friendly projects on their refinery in Kalundborg, Denmark.

Smooth and cost-effective EPC set-up in the North Sea

In the summer of 2014 a joint venture between Ramboll Oil & Gas and Semco Maritime were rewarded an EPC contract for the provision of onshore and offshore services to Hess Denmark’s platforms in the Danish North Sea.

Various engineering projects at the Nybro gas treatment plant

Ramboll Oil & Gas has provided a number of services for the Nybro gas treatment plant in Denmark, where natural gas from the South Arne and Tyra fields is purified and dried, and sulphur is removed, when necessary.

Cross-border tie-in from subsea station, Trym, to Harald platform

Maersk Oil is the main operator of the Danish North Sea oil fields. In 2011 Maersk Oil entered its first cross-border tie-in, which enables gas and condensate from Norwegian waters to be taken to Maersk Oil’s Harald platform for processing before exporting onwards.

Amazing Al Shaheen

Al Shaheen is a production oil and gas field off the North East coast of Qatar in the Arabian Gulf. The oil field lies over the North Gas Field; the largest gas field in the world. Al Shaheen has been developed by Maersk Oil in what constitutes one of the largest and most complex offshore oil and gas projects undertaken in the world today.

Cutting carbon footprints - flare gas recovery on South Arne

Hydrocarbon emissions from platforms and refineries are a source of atmospheric pollution, and there is a strong drive in the industry to find environment-friendly solutions. Ramboll Oil & Gas has considerable experience in this field, and recently we completed the design of a flare gas recovery system for the North Sea platform, South Arne operated by Hess Denmark.

Lifetime extension for FPSO Petrojarl 1

FPSO Teekay Petrojarl I was operating on the Glitne Field for Statoil, and was planned to operate for another five years there. In turn, the owner of the FPSO, Teekay Petrojarl Production, was evaluating to extend the lifetime of the FPSO with 15 years.

The Gassco Emden Project - Extensive revamp of vital onshore gas receiving terminal

After more than 30 years of operation, the Norsea Gas Terminal in Emden, Germany, needed to be refurbished to maintain safe and reliable gas transportation. The major scope of work included new receiving-, gas heating-, utilities- and process facilities. Ramboll carried out the FEED study proposing the technical solution.

Increasing well capacity of jack-up drilling rig Maersk Inspirer

In 2012 Maersk FPSO awarded Ramboll Oil & Gas an Engineering, Procurement and Construction (EPC) contract comprising enhancements to the jack-up drilling rig, Maersk Inspirer.

Offshore field development and modifications for Dan F since 1991

As consultant to operator Maersk Oil, Ramboll has worked on a number of projects at the North Sea oil field, Dan F.

Offshore field development and modifications for Halfdan since 1999

Ramboll has acted as steady engineering consultant to Maersk Oil on their Danish offshore oil field, Halfdan, since 1999. Ramboll’s involvement started with early field development work and has continued through the years with ongoing brownfield work.

Ramboll Group A/S

Ramboll Group A/S
Hannemanns Allé 53
DK-2300 Copenhagen S
Denmark
Tel: +45 5161 1000
Fax +45 5161 1001

Mail: info@ramboll.com

Danish CVR numbers

Danish CVR numbers

Ramboll Group
10160669

Rambøll Danmark
35128417

Ramboll Energy
35128417

Rambøll Management Consulting
60997918

Other sites