Projects

Over the years, we have solved many distinctive and challenging projects for our customers. Ramboll’s Project excellence programme is dedicated to providing clients with world class project management competencies and the very best results.


Technical safety study for Goliat FPSO

In order to ensure its safe operation in arctic conditions, Ramboll carried out a winterization study on the Goliat FPSO on behalf of the operator ENI Norge.

Flowlines and transmission pipelines on Gjøa, Norway

As a net importer of natural gas, the UK is heavily dependent on reliable gas supplies from gas exporting countries such as Norway. Ramboll Oil & Gas is in charge of the detailed design of the pipeline systems for the Gjøa field, which will be connected to the UK gas transmission system.

Risk analysis at Nybro gas treatment plant

Ramboll Oil & Gas has provided a number of services for the Nybro gas treatment plant in Denmark, where natural gas from the South Arne and Tyra fields is purified and dried, and sulphur is removed, when necessary. In 2005 Ramboll conducted a major risk analysis assessment for the Nybro gas treatment plant.

Plant-wide De-oiling of Produced Water using Advanced Control; Supporting research

In 2012 the Danish National Advanced Technology Foundation announced its financial contribution to a research project conducted by Aalborg University and endorsed by Maersk Oil and Ramboll Oil & Gas. The project tackles the problem of oil recovery by looking into ways of ensuring a higher productivity and less oil in the produced water.

Gryphon FPSO - air compression upgrade project on an EPCM contract

The Maersk owned Gryphon Alpha FPSO processes oil and gas for the Gryphon, South Gryphon, Tullich and Maclure fields in the British North Sea. The oil is exported by tanker. Gas is exported via a pipeline to Beryl Alpha, where it is transported to shore via the SAGE system. For this project Ramboll performed detailed design including procurement and fabrication of 3 new air compressor skids.

The Tyrihans oil and gas field, Norway

Statoil will soon be supplying their customers with oil and gas from the Tyrihans field on the Norwegian continental shelf. In 2006 Ramboll Oil & Gas commenced a detailed design project for the new pipelines and subsea structures on Tyrihans.

Smokeless flare, Fahahil Stripping Plant

Ramboll was given the task of remodelling and enlarging an existing old flare system at the Dukhan oil field on the west coast of Qatar.  In addition, we were to find a method for reclaiming some of the gas that would otherwise be burnt in the tower. At last, we were to implement improved combustion technology to obtain what is known as a “smokeless flare”- which means a flame without smoke.

South Timbalier Field - Two Platforms for B Complex

Ramboll provided engineering services for a fast track offshore project in the Gulf of Mexico.

The Morvin field development project

The Morvin field is located 20 kilometres west of the Åsgard B platform at Haltenbanken in the Norwegian Sea.

Polvo Field Development - Engineering services

We carried out a significant engineering project for the Polvo Field Development off the coast of Brazil.

Engineering for onshore oil and gas facility at Quiriquire

The Quiriquire field, located in Monagas State, Venezuela, is the largest oil field in eastern Venezuela and also by worldwide standards it is a giant field. Maxus/YPF awarded Ramboll the detailed engineering for an onshore oil and gas production facility at Quiriquire.

Concept study for new flare project at Statoil Refinery Kalundborg

The StatoilHydro Refinery in Kalundborg is flaring directly to the atmosphere from a certain amount of PSV’s. The purpose with the project is to collect all discharge facilities to a new common flare system, Flare-3.

Hejre development project

The Hejre field development project in the north-western part of the Danish sector of the North Sea will be one of the largest Danish investments in offshore oil and gas production for many years to come. Ramboll has been involved in the project for a number of years.

FEED and detailed design for Gina Krog subsea pipelines

As part of the development of the Sleipner area, Statoil planned to utilise existing process and export facilities for production from satellite platforms. Statoil selected Ramboll to perform  FEED and detailed engineering of subsea pipelines to the satellite field, Gina Krog.

FEED and detailed design for Gudrun pipeline system

As part of the Sleipner SPORT development project, satellite platform Gudrun was tied-in to Sleipner, for oil and gas processing and export. Statoil awarded Ramboll the FEED and detailed engineering of the subsea pipeline system.

The Piranema FPSO - designing for a confined space

The FPSO (Floating Production, Storage and Offloading) Piranema is the world's first cylinder shaped FPSO in production. It was constructed by Sevan Marine with Kanfa and Ramboll as engineering partners.

Ensuring compressor integrity at the Siri platform

DONG Energy operates the Siri field in the North Sea. During the work with the flare, relief and blowdown report for the Siri platform, Ramboll detected that the lead pipe pressure drop was above 3% of the PSV set-point on the lead pipes in the 26C compressor train.

Tyra East Rationalisation Project

The Tyra Field is the largest gas field in the Danish North Sea sector – it is operated by Maersk Oil, and has been producing since 1984. Ramboll has been part of the Tyra East Rationalisation Project; just one phase in a series of Optimisation Projects in the field.

Drilling and production platform for the Gulf of Mexico

Ramboll provided complete engineering services for topside and pipeline structures in the Gulf of Mexico.

Mustang - Unmanned wellhead platform for the Gulf of Mexico

BHP Billiton were extending their activities in the Gulf of Mexico, West Cameron area, a with an unmanned wellhead platform. Ramboll was awarded the design of this minimum-facility platform.

Pre-engineering and detailed design on Nexus FPSO topsides

In 2006 Ramboll Oil & Gas commenced our biggest project to date when we initiated the pre-engineering work on the Nexus project for APL NEXUS and Samsung. Nexus is a generic FPSO with a free and fully weather-vaning turret mooring that can accommodate up to 6 risers.

Rectification of GRE piping systems at Al Shaheen

Maersk Oil Qatar operates the Al Shaheen field located 180 kilometres off the North East coast of Qatar in the Arabian Gulf. First oil was produced in 1994, and since then the field has undergone tremendous development with modification works and new designs still taking place on a continuous basis.

Unprecedented substation design for Hornsea One offshore wind farm

DONG Energy Wind Power is developing the Hornsea Project One offshore wind farm in the UK. Ramboll carried out the design of a reactive compensation substation for the wind farm, as well as technical assistance during tendering, fabrication and installation.

Increasing well capacity of jack-up drilling rig Maersk Inspirer

In 2012 Maersk FPSO awarded Ramboll Oil & Gas an Engineering, Procurement and Construction (EPC) contract comprising enhancements to the jack-up drilling rig, Maersk Inspirer.

The Gassco Emden Project - Extensive revamp of vital onshore gas receiving terminal

After more than 30 years of operation, the Norsea Gas Terminal in Emden, Germany, needed to be refurbished to maintain safe and reliable gas transportation. The major scope of work included new receiving-, gas heating-, utilities- and process facilities. Ramboll carried out the FEED study proposing the technical solution.

South Arne Phase III - Tie-in of two additional wellhead platforms

In 2010, Hess decided to expand their activities on the South Arne field with two additional wellhead platforms as part of the Phase III Development. Hess, Semco Maritime and Ramboll formed an EPC alliance to carry out brownfield work related to the project.

Sustainable development at Statoil Refinery

Since 1995 Statoil has executed large scale extension and modification environmental-friendly projects on their refinery in Kalundborg, Denmark.

Lifetime extension for FPSO Petrojarl 1

FPSO Teekay Petrojarl I was operating on the Glitne Field for Statoil, and was planned to operate for another five years there. In turn, the owner of the FPSO, Teekay Petrojarl Production, was evaluating to extend the lifetime of the FPSO with 15 years.

EPCM assistance to Equatorial Guinea Development

The Alba Field is one of the largest producers in the Gulf of Guinea. As engineering consultant, Ramboll paid a significant contribution to the development of the oil and gas field from 1997-2003.

The development of the Kuvykin field

Ramboll will contribute to the development of the Kuvykin field in the Russian sector of the Caspian Sea with pre-FEED studies for a drilling complex and topside living quarters designed for operation in arctic conditions.

Natural gas storage facility in Etzel, Northern Germany

The national gas markets in Europe are changing rapidly. Continuous liberalisation, dependency on gas imports from outside the EU, and increasing consumer demand have stepped up the need for strategic as well as commercial storage facilities. Ramboll has been deeply involved in these developments since the 1990s and in 2008 we assisted Etzel-Kavernenbetriebsgesellschaft mbH & CO. KG with the development of the Etzel salt cavern storage facility near Wilhelmshaven, Germany.

Unmanned wellhead platforms for Valhall Flank development

As part of the development of the Valhall field, BP commissioned Ramboll and alliance partners Heerema Tønsberg and IV Oil & Gas to engineer, construct and install two unmanned wellhead platforms at Valhall Flank.

Polarled: Record-breaking subsea pipeline crosses the Arctic Circle

The Polarled pipeline project is part of the plans for developing fields further north in the Norwegian Sea.  

Various engineering projects at the Nybro gas treatment plant

Ramboll Oil & Gas has provided a number of services for the Nybro gas treatment plant in Denmark, where natural gas from the South Arne and Tyra fields is purified and dried, and sulphur is removed, when necessary.

Assessments for the Solsort field development

In 2010 DONG Energy made an interesting oil find in the Danish North Sea, in the Solsort Prospect. An extensive data collection programme was carried out, and subsequently Ramboll assisted on a number of studies to assess the feasibility in developing the asset.

Amazing Al Shaheen

Al Shaheen is a production oil and gas field off the North East coast of Qatar in the Arabian Gulf. The oil field lies over the North Gas Field; the largest gas field in the world. Al Shaheen has been developed by Maersk Oil in what constitutes one of the largest and most complex offshore oil and gas projects undertaken in the world today.

Cross-border tie-in from subsea station, Trym, to Harald platform

Maersk Oil is the main operator of the Danish North Sea oil fields. In 2011 Maersk Oil entered its first cross-border tie-in, which enables gas and condensate from Norwegian waters to be taken to Maersk Oil’s Harald platform for processing before exporting onwards.

Cutting carbon footprints - flare gas recovery on South Arne

Hydrocarbon emissions from platforms and refineries are a source of atmospheric pollution, and there is a strong drive in the industry to find environment-friendly solutions. Ramboll Oil & Gas has considerable experience in this field, and recently we completed the design of a flare gas recovery system for the North Sea platform, South Arne operated by Hess Denmark.

Underground gas storage at Ninotsminda gas capped oil field

Georgia has experienced a pressing desire to build an Underground Gas Storage (UGS) for the sake of security of natural gas supply within the country of Georgia. An underground gas storage offers the ability to accommodate seasonal and short-term fluctuations in the demand for natural gas.

Offshore field development and modifications for Halfdan since 1999

Ramboll has acted as steady engineering consultant to Maersk Oil on their Danish offshore oil field, Halfdan, since 1999. Ramboll’s involvement started with early field development work and has continued through the years with ongoing brownfield work.

Offshore field development and modifications for Dan F since 1991

As consultant to operator Maersk Oil, Ramboll has worked on a number of projects at the North Sea oil field, Dan F.

Ramboll Group A/S

Ramboll Group A/S
Hannemanns Allé 53
DK-2300 Copenhagen S
Denmark
Tel: +45 5161 1000
Fax +45 5161 1001

Mail: info@ramboll.com

Danish CVR numbers

Danish CVR numbers

Ramboll Group
10160669

Rambøll Danmark
35128417

Ramboll Energy
35128417

Rambøll Management Consulting
60997918

Other sites

Other sites