Projects

Over the years, we have solved many distinctive and challenging projects for our customers. Ramboll’s Project excellence programme is dedicated to providing clients with world class project management competencies and the very best results.


The Tyrihans oil and gas field, Norway

Statoil will soon be supplying their customers with oil and gas from the Tyrihans field on the Norwegian continental shelf. In 2006 Ramboll Oil & Gas commenced a detailed design project for the new pipelines and subsea structures on Tyrihans.

Various engineering projects at the Nybro gas treatment plant

Ramboll Oil & Gas has provided a number of services for the Nybro gas treatment plant in Denmark, where natural gas from the South Arne and Tyra fields is purified and dried, and sulphur is removed, when necessary.

Natural gas storage in the EU

Ramboll Oil & Gas' Studies & Planning department was selected by the European Commission to review the European gas storage market and provide guidance in the input for the Second Strategic Energy Review and the work of the Gas Coordination Group.

Natural gas storage facility in Etzel, Northern Germany

The national gas markets in Europe are changing rapidly. Continuous liberalisation, dependency on gas imports from outside the EU, and increasing consumer demand have stepped up the need for strategic as well as commercial storage facilities. Ramboll has been deeply involved in these developments since the 1990s and in 2008 we assisted Etzel-Kavernenbetriebsgesellschaft mbH & CO. KG with the development of the Etzel salt cavern storage facility near Wilhelmshaven, Germany.

Risk analysis at Nybro gas treatment plant

Ramboll Oil & Gas has provided a number of services for the Nybro gas treatment plant in Denmark, where natural gas from the South Arne and Tyra fields is purified and dried, and sulphur is removed, when necessary. In 2005 Ramboll conducted a major risk analysis assessment for the Nybro gas treatment plant.

Natural gas storage in the EU - projects for the European Commission

Securing natural gas supply to EU member states is a matter of significant importance for the EU. The increasing import dependency of natural gas in the EU coupled with increased demand for flexibility in gas markets has made natural gas storage a central issue in the EU’s energy debate regarding market development and security of supply.

Engineering for onshore oil and gas facility at Quiriquire

The Quiriquire field, located in Monagas State, Venezuela, is the largest oil field in eastern Venezuela and also by worldwide standards it is a giant field. Maxus/YPF awarded Ramboll the detailed engineering for an onshore oil and gas production facility at Quiriquire.

Upgrade of LNG berth at Ras Laffan in Qatar

Ras Laffan is the centre of LNG and GTL activities in Qatar and the port is considered one of the largest LNG export facilities in the world. Ramboll Oil & Gas undertook the detailed engineering for an upgrade of the LNG berth at Ras Laffan during 2009 and 2010.

Plant-wide De-oiling of Produced Water using Advanced Control; Supporting research

In 2012 the Danish National Advanced Technology Foundation announced its financial contribution to a research project conducted by Aalborg University and endorsed by Maersk Oil and Ramboll Oil & Gas. The project tackles the problem of oil recovery by looking into ways of ensuring a higher productivity and less oil in the produced water.

Securing supply and diversifying the energy mix in Morocco

In a joint venture with French partner Sofregaz, Ramboll will develop an integrated gas-to-power project for Morocco’s state power and water utility ONEE.

Tyra South East A - Design of unmanned wellhead platform for gas condensate field

As part of the Tyra field development in the Danish North Sea, operator, Maersk Oil, contracted Ramboll to assist with a number of engineering services for the design of the Tyra South East A platform. Tyra South East A came on stream in 2002.

Smokeless flare, Fahahil Stripping Plant

Ramboll was given the task of remodelling and enlarging an existing old flare system at the Dukhan oil field on the west coast of Qatar.  In addition, we were to find a method for reclaiming some of the gas that would otherwise be burnt in the tower. At last, we were to implement improved combustion technology to obtain what is known as a “smokeless flare”- which means a flame without smoke.

Pre-engineering and detailed design on Nexus FPSO topsides

In 2006 Ramboll Oil & Gas commenced our biggest project to date when we initiated the pre-engineering work on the Nexus project for APL NEXUS and Samsung. Nexus is a generic FPSO with a free and fully weather-vaning turret mooring that can accommodate up to 6 risers.

Smooth and cost-effective EPC set-up in the North Sea

In the summer of 2014 a joint venture between Ramboll Oil & Gas and Semco Maritime were rewarded an EPC contract for the provision of onshore and offshore services to Hess Denmark’s platforms in the Danish North Sea.

Kirinskoye, Sakhalin – Installation engineering in the Arctic region

Kirinskoye is the first offshore field in Russia to utilise a subsea system for natural gas production. The field holds over 100 billion cubic metres of gas and 11.4 million tonnes of gas condensate.   The Kirinskoye gas and condensate field is part of the 'Kirinsky block' in the Sea of Okhotsk and is one of the main development priorities for Gazprom, the world's largest gas producer.The field is part of a Russian Federation strategy for development of an integrated gas production, transportation and supply system to the regions of Eastern Siberia and the Far East.

Society consultant on energy trade in the Arab region

CESI and Ramboll teamed up to determine the best options for electrical and gas interconnections in connection with the creation of a single energy market for 20 Arab countries by 2030.

Tyra East Rationalisation Project

The Tyra Field is the largest gas field in the Danish North Sea sector – it is operated by Maersk Oil, and has been producing since 1984. Ramboll has been part of the Tyra East Rationalisation Project; just one phase in a series of Optimisation Projects in the field.

Polarled: Record-breaking subsea pipeline crosses the Arctic Circle

The Polarled pipeline project is part of the plans for developing fields further north in the Norwegian Sea.  

The Nord Stream pipeline project

European gas consumption is increasing, and in order to meet these demands and ensure a long-term reliable supply line of energy, it was decided to establish a 1,224 kilometre dual pipeline system running from Vyborg, Russia to Lubmin near Greifswald, Germany. The project is called the Nord Stream Pipeline.

South Timbalier Field - Two Platforms for B Complex

Ramboll provided engineering services for a fast track offshore project in the Gulf of Mexico.

Conceptual study for wellhead platform in the Snorre field

The Snorre field in the Norwegian North Sea is to be developed further through the addition of a wellhead platform, and Ramboll was appointed to provide conceptual recommendations for the facility.

The Piranema FPSO - designing for a confined space

The FPSO (Floating Production, Storage and Offloading) Piranema is the world's first cylinder shaped FPSO in production. It was constructed by Sevan Marine with Kanfa and Ramboll as engineering partners.

Offshore substation for Belgian wind farms. Detailed design.

Ramboll assisted Belgium’s transmission system operator, Elia, with the detailed design of an Offshore Switch Yard platform (OSY). The work was part of a large project that plans to improve wind energy transmission.

Safety documentation for Maersk ultra deepwater drillship

Ramboll assisted Maersk Drilling with supervision and facilitating the development of safety documentation for a newly built deepwater drillship. It is Maersk Drilling's first drillship in a future ultra deepwater fleet, which will operate at extreme depths and offer outstanding solutions both regarding safety and efficiency.

The Morvin field development project

The Morvin field is located 20 kilometres west of the Åsgard B platform at Haltenbanken in the Norwegian Sea.

Mustang - Unmanned wellhead platform for the Gulf of Mexico

BHP Billiton were extending their activities in the Gulf of Mexico, West Cameron area, a with an unmanned wellhead platform. Ramboll was awarded the design of this minimum-facility platform.

South Arne Phase III - Tie-in of two additional wellhead platforms

In 2010, Hess decided to expand their activities on the South Arne field with two additional wellhead platforms as part of the Phase III Development. Hess, Semco Maritime and Ramboll formed an EPC alliance to carry out brownfield work related to the project.

Offshore field development and modifications for Dan F since 1991

As consultant to operator Maersk Oil, Ramboll has worked on a number of projects at the North Sea oil field, Dan F.

Rectification of GRE piping systems at Al Shaheen

Maersk Oil Qatar operates the Al Shaheen field located 180 kilometres off the North East coast of Qatar in the Arabian Gulf. First oil was produced in 1994, and since then the field has undergone tremendous development with modification works and new designs still taking place on a continuous basis.

Nini and Cecilie - Minimum-facility platforms for a marginal field

Ramboll has assisted DONG Energy with a development project for modification of the Siri field in the North Sea, where we designed two lightweight and robust minimum-facility platforms, Nini and Cecilie.The two unmanned wellhead platforms operate as satellites tied back to the mother platform, Siri, via three inter-field pipelines. The water depth is approximately 60 metres.

Ramboll Group A/S

Ramboll Group A/S
Hannemanns Allé 53
DK-2300 Copenhagen S
Denmark
Tel: +45 5161 1000
Fax +45 5161 1001

Mail: info@ramboll.com

Danish CVR numbers

Danish CVR numbers

Ramboll Group
10160669

Rambøll Danmark
35128417

Ramboll Energy
35128417

Rambøll Management Consulting
60997918

Other sites

Other sites