South Timbalier Field - Two Platforms for B Complex

Contact

Jesper Thomsen

Jesper Thomsen

M.Sc., chemical eng., Director, Business Development, North Sea
T: +45 5161 2375

Ramboll provided engineering services for a fast track offshore project in the Gulf of Mexico. 

El Paso Production (now Kinder Morgan Inc.) contracted Excel Engineering (now Ramboll) for the design of two platforms to be located in the South Timbalier Block 204, which is an oil field in the Gulf of Mexico off the Louisiana coast (US). The project for the Block 204 "B" complex comprised a production platform (B-Production) and a bridge connected auxiliary platform (B-Aux) in 153 ft. / 47 m. of water. 

El Paso Production outlined an aggressive project schedule where design, fabrication, installation and start-up were to be completed in nine months for B-Aux and seven months for B-Production.  

Ramboll succeeded in meeting the tight schedule and also managed all coordination with pipeline companies and compressor vendor. The two platforms were designed for simultaneous operations.

Ramboll provided engineering for the structural and facilities design, procurement, and project and construction management. 

Production rates for the B-Production platform were estimated at 30,000 BPD Condensate and 5,000 BPD Water. For the B-Auxiliary platform 30,000 BPD Condensate, 380 MMSCFD Gas and 5,000 BPD Water.

Ramboll Group A/S

Ramboll Group A/S
Hannemanns Allé 53
DK-2300 Copenhagen S
Denmark
Tel: +45 5161 1000
Fax +45 5161 1001

Mail: info@ramboll.com

Danish CVR numbers

Danish CVR numbers

Ramboll Group
10160669

Rambøll Danmark
35128417

Ramboll Energy
35128417

Rambøll Management Consulting
60997918

Other sites

Other sites