A major focus area for railway infrastructure owners is determining how to optimise their infrastructure in order to fulfil the demands for operational reliability whilst at the same time keeping maintenance costs down. As a result, very large sums are invested in renewing existing railways. At the same time, many lines are upgraded for higher speed or axle load.
 
Over more than 10 years, Ramboll has participated in a large number of renewal and upgrade projects. We have participated in the improvement of concepts for procurement and competition to secure the best use of allocated funds.

Holistic and expert services

We work together with companies capable of making pre-investigations of projects. This part of the project life cycle therefore also becomes a natural part of our services. Our services on renewal and upgrading include:

  • Design of permanent way system (superstructure as well as substructure)
  • Signalling works
  • Telecommunication
  • Catenary systems and power supply
  • High voltage
  • Earthworks and drainage
  • Embankments
  • Level crossing (road part)
  • Environmental services
  • Risk management
  • Planning of execution
  • Inspection and construction management
  • Management of pre-investigations
  • Safety Approval Process
  • Alignment

Approx. 400 kilometres of track

We participate in a large number of upgrade and renewal projects. Examples include:
  • Farumbanen, 44 km, 29 switches and 3 crossings
  • Valby – Ballerup, 8 km and 8 switches
  • Sporgruppe 40, Copenhagen, 1 km and 9 switches
  • Østerport, 2 km and 7 switches
  • Fredericia North, 1 km, 16 switches and 2 crossings
  • Fredericia South, 1 km, 14 switches and 1 crossing
  • Odense – Middelfart, 75 km, 32 switches
  • Bramming – Tønder, 43 km, 15 switches and 15 level crossings
  • Aalborg – Frederikshavn, 80 km, 34 switches and 11 level crossings
  • Skanderborg – Aarhus, 40 km and 3 switches
  • Høng – Ruds Vedby, Regional line, 8 km
  • Padborg – Taulov, 16,5 km, 20 switches and 3 level crossings
  • Access to service platform, Aarhus H, 100 m track, 2 switches and 1 crossing switch
  • Herning – Give – Vejle, 75 km
  • Copenhagen Central Station (6th main track), 2 km, 12 switches, 2 crossings

Ramboll Group A/S

Ramboll Group A/S
Hannemanns Allé 53
DK-2300 Copenhagen S
Denmark
Tel: +45 5161 1000
Fax +45 5161 1001

Mail: info@ramboll.com

Danish CVR numbers

Danish CVR numbers

Ramboll Group
10160669

Rambøll Danmark
35128417

Ramboll Energy
35128417

Rambøll Management Consulting
60997918

Other sites

Other sites